All regions

Scaleway

🇵🇱 Warsaw

Polandpl-waw

610gCO₂/kWh

Carbon intensity

45%

Renewable energy

~35ms

Latency from France

99.9%

Availability SLA

€30/month

Standard VM

Carbon intensity — 12 months

Monthly grid average in gCO₂eq/kWh (seasonal trend)

Electricity mix

Estimated generation sources — 45% renewable

Latency vs nearby regions

Estimated round-trip time from France, in milliseconds

Estimated pricing

Indicative monthly list prices in Warsaw — actual prices depend on commitment and usage.

Nano

1 vCPU · 1 GB RAM

€8/mo

Small

2 vCPU · 4 GB RAM

€18/mo

Medium

4 vCPU · 16 GB RAM

€30/mo

Large

8 vCPU · 32 GB RAM

€60/mo

XLarge

16 vCPU · 64 GB RAM

€120/mo

GPU

8 vCPU · 1× GPU · 48 GB RAM

€360/mo

Frequently asked questions

How green is the Scaleway Warsaw region?

Warsaw scores 42/100 on our Green Score. Its grid runs at 610 gCO₂eq/kWh with 45% renewable energy — consider a lower-carbon region if your workload allows it.

How is the Green Score calculated?

The score blends five weighted criteria: carbon intensity (40%), renewable energy (25%), availability (15%), latency (10%) and price (10%). Each metric is normalized to 0–100 before weighting.

Where does the data come from?

Carbon and renewable figures are based on public grid data (Electricity Maps, national TSOs) and provider sustainability reports. Prices are indicative list prices for a 4 vCPU / 16 GB VM. The data layer is designed to plug live APIs in later.

What latency should I expect from France?

We estimate ~35 ms round-trip from mainland France to Warsaw. Real-world latency varies with your network path and peering.

At a glance:610 gCO₂/kWh45% renewable~35 ms99.9% SLAGreen Score 42/100